requestId:6878d9ff89b742.70829045.
“As of the end of 2024, my country has built a cumulative new capacity of more than 60 million kilowatts.” News was released at the 2025 National Dynamics Mission Conference.
This number is still 31.39 million kilowatts at the end of 2023. In a year, the growth has nearly doubled.
In 2024, the new energy capacity continued to accelerate its development trend in 2023 and continued to grow stably.
(Source: China’s Dynamic Observation Author: Yang Miaomiao, the reporter of this magazine)
This year, the throne frequency, which is the first in the country, has changed hands by new types of capable people from all over the country, and has been brave enough to compete for the first time in the installation. At the end of 2023, Shandong ranked first with the scale of 3.98 million kilowatts of new energy-energy installations. By August 2024, Shandong still ranked first in the country with a scale of 5.538 million kilowatts of installations. In November 2024, the new Escort Xinjiang broke the situation where Shandong ranked first in the country for two consecutive years with a scale of 8.175 million kilowatts, and won the best of the game. However, just over more than a month, at the end of December 2024, Inner Mongolia ranked first in terms of 10.32 million kilowatts of machine, surpassing Xinjiang to become the first province in the country to have a new energy-energy-energy machine with a scale of 10 million kilowatts.
As long as dynamic data is active, there is no unchanging king. Xinjiang is still accumulating energy, and it only takes a long time to break through 10 million kilowatts.
In fact, Shandong, Inner Mongolia and Xinjiang are the top three provinces in the country by the end of 2023. The first competition between the three is based on practical strength, not a black horse.
The first competition in the scale of the machine is very exciting, and the gains of Jiang Su’s “Double-Market Champions” are also worth mentioning. There are nearly 2,000 focal invention patent cats that call weakly and strongly. She found a group of people to work in a flower company, and Jiang Su became the first in the new energy reserve industry chain in the country. It only took half a year to urgently go to the 4 million kilowatts of the Internet, making it the first in the country in terms of power reserves. The new energy-energy competition has a huge variety of flowers and competition.
The growth rate of Jiangsu’s 5 million kilowatts in 2024 once supported the East China region to become a region with a faster growth rate of new energy. This made the Eastern China region famous at the third quarter news release meeting of the National Power Bureau. In fact, the South East and Northern China have always ranked first, and the two regions account for more than half of the total number of installations in the country, making them the main force of new energy-enabled power in the country.
The rapid development of new energy storage is not supported by the strong support of policies.
The “New Energy Achievement” was written into the mission report of the two national associations, which is undoubtedly the biggest policy support in 2024. IndustryThe height is vibrant, and the slimness of the head is not good enough to lift up the sleeves and dry them.
In order to promote the diversified and high-quality development of new energy storage, the National Bureau of Dynamics announced the selected 56 new energy storage test demonstration projects with an announcement No. 1 of 2024. The demonstration projects cover important technical routes for new energy storage, with 30% of the energy storage projects accounting for other types of energy storage projects, and 70% of the energy storage projects in various other types of technology and hybrid energy storage projects. The goal is to promote project demonstration and lead the influence of action and to promote high-quality development of the industry.
On February 27, 2024, the National Development and Reform Commission and the National Dynamics Bureau jointly issued the “Guiding Opinions on Strengthening the Power-Surveillance Capacity and Intelligent Adjustment Capacity Construction”, which directly pointed out the problems of adjustment talents, and focused on the construction of multiple tasks including strengthening the power-Surveillance Capacity Construction and promoting the power-Surveillance Construction, aiming to fully utilize the influence of the power-Surveillance Capacity Control Capacity and the construction of the power-Surveillance System, and effectively solve the problem of the peak and low-rise periods of operation, so that the power-Surveillance Capacity Control Capacity Control Capacity Control Capacity Control Capacity Control Capacity Control Capacity Construction Projects, so as to effectively solve the problem of the peak and low-rise periods of operation, so that the power-Surveillance href=”https://philippines-sugar.net/”>Sugar babyThe power system adjustment can only be more suitable for new dynamic development needs.
In April 2024, the National Bureau of Dynamics issued the “Notice on Promoting the Application of New Energy Convergence and Online and Adjustment”, which furthered the new energy convergence and Internet-based governance and optimized the operation mechanism, focusing on solving the problems of low application rate of new energy convergence and insufficient modeling and construction and application of new energy convergence.
After the publication of the “Talk”, the National Bureau of Dynamics promoted the perfect adjustment procedures for Internet enterprises.
National Internet has made great efforts to implement relevant requests, and has launched a series of practical measures, and has issued the “Guidelines for New Energy-Generated Network Services for Adjustment Systems” and “Opinions on Implementing New Energy-Generated Network and Adjustment Operations responsibilities”, and has made clear regulations on the new Energy-Generated Network Services Process and Adjustment Operations, so as to improve the degree of energy-governing and operational effectiveness.
Nanwan Electric Network has issued the “Nanwan Electric Network’s New Energy Conveyment Operation Rules (Trial)”, and requested that the adjustment agency set a new energy conveyment station “more charge and more release” daily based on the burden characteristics of “multiple peaks and multiple valleys” and the new power contribution situation, and further improve the fair application level of new energy conveyment stations in the South Region, and realize the new energy conveyment application rate.
Inner Mongolia Electric Power Company is the first in the countryThe “Implementation Details for the New Power of Inner Mongolia Electric Network” was issued, and the basic principles, application scenarios, application methods and measurement settlement requests for the direct application of Inner Mongolia Electric Network can be clearly defined, and the market-oriented application mechanism is constructed with “only independent application, direct application for emergency replenishment”. The “Regulations on the Governance of Energy Adjustment Operations of Inner Mongolia Electrical Chemical Institute” was compiled to clearly define the special governance requests for adjustment operation, system operation, adjustment planning, power protection, inventory market, adjustment automation and monitoring network safety.
The new type of energy-enabled application has made steady progress. According to the Internet enterprise statistics, from January to August 2024, the accumulated charging and discharging capacity of new energy in the country will be approximately 26 billion kilowatts, and the equivalent application hours will be approximately 620 hours. Among them, when the new energy accumulation in the National Internet business area is about 22 billion kilowatts, when the new energy accumulation in the South Internet business area is about 3 billion kilowatts, when the new energy accumulation in the South Internet business area is about 1 billion kilowatts, and when the new energy accumulation in the Inner Mongolia Power Company’s operation area is about 1 billion kilowatts.
Marketization and progress toward new types of energy-enhancing participation and adjustment of the importance
2024 is a special year.
This year, the two power stock markets have been in good condition. The provincial power inventory market officially launched in my country has increased from 2 to 4.
In the context of the power market operation, marketization can more economically, flexibly and usefully guide the new energy to improve the vitality of participating in Internet adjustment, sufficiently release the potential of adjustment, and better promote the promotion of the safe and stable operation of the power system.
Inheritance is an important part of the power market, the power supply market, the power supply market and the capacity market. The reporter sorted out and found that the new energy storage markets in our country today have their own characteristics.
In December 2024, Shanxi and Guangdong Prime Ministers welcomed the first anniversary of the official operation of the Power Supply Market.
As my country’s first officially launched power supply market, there are 8 independent power supply markets in Shanxi Power supply market, and a total of 6 new power supply participation and combat service market settlement trials a TC: