requestId:688e5bcfa65a26.59411655.
On May 6, the Jinzhou Municipal Bureau of Industry and Information Technology issued the 2025 orderly electric use plan.
Analysis of power supply and demand patterns Predictions:
1. Analysis of power supply and demand situation in the previous year
2 500 kV transformer stations (Dongjia, Beining), with a capacity of 3,000 megavolt amps; 220 kV transformer 15 electric stations (including 2 open stations), with a change capacity of 4140 megavolt amp; 13 electric wire transfer stations of 220 kV; 16 500 kV transmission lines belonging to the company, 83 220 kV transmission lines belonging to the user, 7 220 kV transmission lines belonging to the user; 66 kV conversion station 179 (including 83 of the company, 30 of the Linghai Company, 66 of the user station); 346 of the 66 kV transmission line (including 2 branches of the company, a sluggish little mate was found in the branches of the company. 39, 41 of the Linghai Company, 66 of the user), and the 220 kV system 500 kV Dongjiachang, Beiningchang and 2 firepower plants are used as power support. The main transmission and transformation system of the 500 kV line and 15 220 kV stations (1 open station), and 13 220 kV electric railway transfer stations form the main transmission and transformation system of the Zhou Electric Network, with 220 Sugar babyKV mother line forms a multi-circular network structure for the nodes, which can meet the burden needs of the local Sugar daddy.
2. Analysis of the annual electricity demand of the region
The maximum annual electricity power of the region in the Jinzhou region is 1,490 megawatts, a year-on-year drop of 6.87%.
3. The regional network transmission can only analyze
16 500 kV transmission lines, the length of the maintenance section is 803.86 kilometers, and the length of the 220 kV transmission lines is 90. Among them, the company has 84 220 kV transmission lines, the length of the maintenance section is 1686.85 kilometers; the length of the 66 kV transmission lines is 346 66 kV transmission lines, the company has 239 2215.58 kilometers. The loading rate of the 220 kV and below area is within a fair range, so the power supply can meet the current load demand.
4. Analysis of regional power generation
Zhuzhou Electric Network’s 220 kV and above system networkThere are 15 power plants with a total capacity of 3681 megawatts; among which 500 kV system is connected to one power plant with a total capacity of 660 megawatts; 220 kV system is connected to 12 power plants with a total capacity of 3681 megawatts; escortThe total capacity of the machine is 3292 MW; the capacity of the thermoelectric assembly is 1920 MW, accounting for 58.33% of the total capacity of the machine; the capacity of the wind turbine assembly is 1372 MW, accounting for 41.67% of the total capacity of the machine. There are 25 generators on the 66 kV system network of the Luzhou Electric Network, with a total capacity of 822 MW; 4 centralized generators on the 10 kV system network, with a total capacity of 41.5 MW, and 10 10 kV distributed photovoltaic stations on the 39.85 MW.
5. Analysis of the balanced situation of regional power supply and demand
In 2024, the total power supply volume reached 9.019 billion kilowatts, a year-on-year drop of 4.39%. When the daily power supply of the entire mouth reached 30.29 million kilowatts, it occurred on December 20, down 4.72% year-on-year.
The original text is as follows:
Announcement on the 2025 Orderly Use Electricity Plan for the Development of Jinzhou City
Industry and Information Technology Bureaus of each county (city) district, Jinzhou Power Supply Company, Linghai Power Supply Independent Company, and related power users:
In accordance with the “Notice of the Industrial and Information Technology Department of Ning Province on Orderly Used Electricity Plan for Organization and Editing in 2025″ (大全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全全� href=”https://philippines-sugar.net/”>Sugar baby can provide electricity supply and combine the actual situation in our city, our bureau organized and compiled the “2025 Jinzhou City Orderly Electric Power Plan”. You will now print and distribute it to you, please follow it.
2025 Jinzhou City Orderly Use Electric Power Plan
1. Introduction
In order to meet the rapid economic development of Jinzhou City and the continuous improvement of the people’s career, while ensuring the safe and stable operation of the Internet, ensure that the power supply is stable and orderly, according to the “Electric Power Deadline Governance Measures (2023 Edition)” (Design and Revise Operation Regulations [2023] No. 1261), “Electric Power Demand Side Governance Measures (2023 Edition)” (Design and Revise Operation Regulations [2023] No. 1283), “Electric Power Deadline Governance Implementation Details” (Design and Revise Operation Measures [2024] No. 20), “Electric Power Industry and Information Technology Hall of the People’s Republic of China” (Design and Information Technology Power [2024] No. 20), “Electric Industry and Information Technology Hall of the People’s Republic of China”The document “Notice on Orderly Used Electricity Plan in 2025” (大家官网彩官网〔2025] No. 22) was requested, and the operation methods of the state’s electric network were combined, and the local area was responsible for the design, and this plan was prepared.
2. Principles of orderly use of electricity missions
Orderly use of electricity plans to compile and implement regional industrial structure, power usage characteristics, power generation capabilities, etc., scientifically analyze the supply and demand forms of electricity, actively conflict with power supply and demand, strictly prevent the power supply and demand, effectively ensure the use of electricity for public career, urban operation and basic public services, insist on demand precedence, and use electricity in an orderly mannerSugar daddy guarantees the bottom line, uses electricity to assist the holidays, and the greatest restrictions will reduce the impact on the city’s economic and social development.
1. The room has a chance to rest. During her nap, she had a dream. Stable and stable
adhere to “total control and structural optimization”, and implement orderly electricity use in accordance with the order of peak first, peak avoidance, and then limit electricity.
2. Insured indefinitely
Adhere to “teacher and teacher training, younger generation”, and first guarantee the main user needs of living in the civil service, public welfare, and national safety. At the beginning, it limits the load on high-energy-consuming and high-emission users, and reduces the power supply and diverges in the industry.
3. Focus on prevention
Adhere to “scientific adjustment and early preparation”, strengthen the prediction and analysis of balanced power supply and demand, and issue power supply and demand warning information in a timely manner, and prepare for orderly electricity use in advance, so as to respond to emergency response capabilities when it is useful.
3. Principles for implementing orderly electricity use
1. Ensure the needs of key electricity enterprises
(1) Emergency guidance and handling departments, important party and military agencies, and users related to national safety and social order in broadcasting, television, telecommunications, road conditions, supervision, etc.
(2) The power outage of hazardous chemical products, mines, etc. will lead to serious personal injury or equipment damage to the security burden of enterprises.
(3) Users who seriously focus on social activities, hospitals, financial institutions, schools and other related groups’ lives and property safety.
(4) Basic facilities such as water supply, heat supply, and Sugar baby.
(5) Live in a civilian life, and use electricity for agricultural production such as drainage and irrigation, fertilizer production and other agricultural production.
(6) National key engineering and military enterprises.
2. Key restrictions on the power requirements under Pinay escort are completed or under construction.
(2) Industry structure adjustment catalogue reduces and restricts enterprises.
(3) Enterprises whose energy consumption of a single product is higher than the national or domestic standard of energy consumption limit.
(4) Landscape lighting and lighting projects.
(5) Other high-energy consumption, high-emission, and low-level enterprises. Based on the energy efficiency rating and basis level in the key areas of high energy consumption industries, the enterprise power demand with energy efficiency below the basis level is preferred.
3. First limit the electricity demand of the “two highs” users
(1) High energy consumption users: “Letter from the National Development and Reform Commission on Implementing the Related Regulations for Implementation of the Power Cost Policy for Stage Decreasing Electricity Costs” and other high-energy-consuming power users, including black metal smelting and pressure-relay pro TC:sugarphili200